ECO250 is Green ESS’s containerised data centre design for GPU computing. We plan to use this compute to train and test solar forecasting models with Australian weather and generation data, then evaluate how those forecasts can guide battery charging, grid electricity use and the timing of flexible compute workloads.

Our Mission

To use AI to better predict local solar generation and help Australian sites coordinate solar power, battery storage and electricity drawn from the grid. We aim to make renewable electricity a practical consideration in how data centres are designed and operated.

Our Vision

We see a future where Australia’s AI compute capacity can grow while making better use of locally available renewable electricity. As solar output and electricity availability change throughout the day, better forecasts can help data centres plan battery charging and schedule flexible compute workloads.

Four GreenMega Ultra battery storage cabinets on a concrete pad outside the warehouse
Illustrative site layout with four GreenMega Ultra battery storage cabinets outdoors. ECO250 is planned for indoor installation.

Our Goals

ECO250 IT zone with five 48U server racks and a front access aisle
ECO250 IT zone and cold aisle render

Build GPU capacity for energy research

We plan to use NVIDIA GPUs and AI software in ECO250 for model training, validation and inference. We will add GPU capacity in stages as our solar forecasting and energy management research grows.

Illustrative weather sensors next to a solar array
Illustration of weather monitoring at a solar site

Train forecasting models for Australian conditions

Train our own models using local weather observations, weather forecasts and site-level solar generation data to predict when and how much electricity a site is likely to generate.

Illustration of rooftop solar at an industrial site
Illustration of industrial rooftop solar

Validate how data centres can use those forecasts

Evaluate when to charge or discharge batteries, draw electricity from the grid and schedule flexible compute workloads. Measure the effect on site electricity use and the share supplied by renewable sources.

The ECO250 Modular Data Centre

The ECO250 design uses a single container, approximately 2.9 m high, with dedicated zones for power distribution, IT equipment, pumps and cooling.

The IT zone is planned with a single row of five 48U server racks. A cold aisle provides access to the front of the racks.

The right-hand cooling bay houses an integrated air-conditioning unit with a finned heat exchanger and four upward-facing air outlets. A separate pump compartment sits beside it. The module is intended for installation inside a warehouse.

ECO250 cutaway showing five 48U server racks and an integrated air-conditioning unit with a black finned heat exchanger and four upper air outlets
ECO250 cutaway render showing five 48U server racks and the integrated air-conditioning unit with four upward-facing air outlets.

Green ESS in Australia

Green ESS established its Australian entity in 2023. Our AI infrastructure work builds on Green ESS’s work in energy storage, software and intelligent controls.